Case Study: Active Harmonic Filter Implementation in Bangalore Industries

  • Home
  • Blog
  • Business
  • Case Study: Active Harmonic Filter Implementation in Bangalore Industries

Introduction:
Case studies show how Active Harmonic Filters transform industrial power systems.

Background:
A medium-scale manufacturing facility in Bangalore was facing high THD, equipment overheating, and production interruptions.

Solution:
Installation of InPhase AHF series filters tailored to the facility’s load profile.

Results:

  • THD reduced from 18% to below 5%
  • Voltage stabilized
  • Equipment lifetime extended
  • Energy savings achieved

Key Takeaways:
AHFs deliver measurable improvements in power quality, efficiency, and operational reliability.

Conclusion & CTA:
Contact InPhase Power Solutions to implement your own Active Harmonic Filter system and improve energy efficiency.

Leave A Comment

Enquire Now